Installation & commissioning

Until the trial run is clean.

Alignment, reconnection, and commissioning at the new site. The line is not handed over as crates — it is handed over running.

What it is

Installation is the reverse of the register: datums, foundations, mechanical set, media, and a trial run. Commissioning closes the project only when the line behaves as a line.

Back to production

  1. 01

    Datums and foundations

    Check the pit, the floor, and the marks.

  2. 02

    Set and align

    Rebuild from the labelled modules.

  3. 03

    Reconnect

    Mechanical, electrical, and fluid systems.

  4. 04

    Trial run

    Safety, accuracy, and handover.

The definition of done

  • Alignment checked, not hoped
  • OEM or customer trials as required
  • A documented handover, not a handshake

Request a quote

Tell us what has to move.